Installation guide
Installation of gabion baskets and gabion fencing – step by step
Below you will find a clear guide covering: ground preparation, basket assembly, fixing to posts, installation of connectors and filling with stone aggregate. This page is prepared for both contractors and investors – concise, practical and easy to follow.
- Tools required:
- Protective gloves
- Driver with an extension bit
- Small ratchet
- M8, M10 and M12 sockets
- Spirit level
- Hammer and pliers
- Builder’s buckets (for filling)
Navigation
Table of contents
Click a section to jump directly to that part of the guide.
Important
Safety
Warning: Install the system wearing protective gloves and safety glasses. Steel components may have sharp edges. The stability of the structure depends on proper foundation and fixing.
- Use only components intended for gabions (panels, posts, accessories).
- Do not fill the basket before it is fully bolted and stabilised.
- Tighten connectors and clamps firmly (according to the guide).
Ground
Ground preparation
Mark the line of the fence / wall, check the ground level and choose the foundation option suitable for the site conditions.
Option A – without a strip foundation
- Compact the base layer (gravel / crushed stone / aggregate).
- Make post holes (a ground auger is recommended).
- Concrete the posts vertically below the frost line.
Option B – strip foundation
- Make a foundation strip approx. 40–60 cm thick.
- Set the stabilising posts deeper into the concrete.
- After the concrete has cured, proceed with basket installation.
Tip: If there is an existing strip foundation, the stabilising posts can be prepared for bolting down on special 15×15 cm base plates.
Components
Accessories and bolts
Bolts
- M5×16 – for bolting basket walls together
- M5×16 – for installing connectors (cross braces)
- M8×100 (full thread) – for fixing the basket to the post
Accessories
- Connectors – connect the front and rear walls (stiffening)
- Connector plates – allow connector installation anywhere along the horizontal strip
- Extension plates – connect baskets in a continuous run
- Standard post clamp – secure basket-to-post connection
- MAX post clamp – reinforced basket-to-post connection
Below we show the installation components in their real form – this makes selection and on-site assembly easier.
Installation
Step-by-step installation
Install the next baskets in the same way, maintaining level and alignment along the fence line.
Stabilisation
Fixing the basket to the stabilising post
For a secure basket-to-post connection use: connector, post clamp, M8×100 bolt (full thread), enlarged washers and a nut.
- Drill through the post at the height of the horizontal strip of the basket.
- Baskets up to H = 100 cm – 1 fixing point.
- Baskets above H = 100 cm – 2 fixing points.
- Tighten the connection firmly until full stability is achieved.
Diagram: fixing the basket to the post
Stiffening
Connectors (cross braces)
Connectors bolt the front wall of the basket to the rear wall and provide stiffness. Install them in the factory holes or anywhere along the horizontal strip using a plate.
Tip: Position the connectors symmetrically. First stabilise the basket on the posts, then tighten the connectors.
Installing the connectors
Stone aggregate
Filling the basket with stone aggregate
- Start filling only after the basket has been fully bolted and stabilised.
- Protect the sides (cardboard / styrofoam / plexiglass) so the stone does not strike the components.
- Fill the stone gradually (ideally with buckets) and continuously adjust its placement.
- Avoid hitting the connectors — this may damage them.
The difference between a basket that is simply “filled” and one with carefully hand-arranged stone is significant — it is worth taking the time for a better visual result.
Diagram: filling and side protection
Details
Connections and special elements
40×15 mm plate (double hole)
Used for building walls longer than 250 cm in one continuous run and for connecting a gabion base section to a taller basket.
Gabion clamps
Used for bolting two baskets together and for fixing fence panels to a basket. Available lengths: 3–3.5 cm (standard) and 6 cm (90° corner).
Corner finishing elements (LUX version) are used for a clean visual finish of basket corners – installed with
M5×16 bolts.
Data
Technical tables
Table 1. Number of connectors (cross braces)
| Basket height | Length 1 m | Length 1.5 m | Length 2 m | Length 2.5 m |
|---|---|---|---|---|
| 21 cm | – | – | 2 | 2 |
| 31 cm | 1 | 2 | 2 | 4 |
| 41 cm | 2 | 3 | 3 | 4 |
| 51 cm | 2 | 3 | 3 | 4 |
| 61 cm | 4 | 5 | 6 | 8 |
| 71 cm | 4 | 5 | 6 | 8 |
| 81 cm | 6 | 8 | 9 | 12 |
| 91 cm | 6 | 8 | 9 | 12 |
| 101 cm | 8 | 10 | 12 | 16 |
| 111 cm | 8 | 10 | 12 | 16 |
| 121 cm | 10 | 13 | 15 | 20 |
| 131 cm | 10 | 13 | 15 | 20 |
| 141 cm | 12 | 15 | 18 | 24 |
| 151 cm | 12 | 15 | 18 | 24 |
| 161 cm | 14 | 18 | 21 | 28 |
| 171 cm | 14 | 18 | 21 | 28 |
| 181 cm | 16 | 20 | 24 | 32 |
| 191 cm | 16 | 20 | 24 | 32 |
| 201 cm | 18 | 24 | 27 | 36 |
For baskets longer than 250 cm, continuous joining with 40×15 mm plates is recommended.
Table 2. Summary of bolts and components
| Component | Size | Application |
|---|---|---|
| Carriage bolt | M5×16 mm | bolting basket walls together |
| Carriage bolt | M5×16 mm | installing connectors |
| Machine bolt | M8×100 mm (full thread) | fixing the basket to the post |
| Washers | enlarged | basket-to-post clamping |
| Nut | M8 | post-to-basket connection |
Table 3. Number of fixing points to the post
| Basket height | Number of fixing points to post |
|---|---|
| up to 100 cm | 1 point |
| 120–200 cm | 2 points |
| > 200 cm | 3 points |
Graphics
Installation diagrams
When connecting a gabion base section to a gabion post, the side basket walls are not duplicated. The taller basket (gabion post) consists of four full walls, while the base sections are bolted to the side of the post and include only the front and rear walls. This solution ensures a compact and aesthetic connection, and after filling with stone the joints are almost invisible.
How gabion posts are bolted to gabion base sections
Diagram: joining baskets in one straight line
If you have technical questions, please contact us at +48 502 997 729.